Please use this identifier to cite or link to this item: https://dr.ddn.upes.ac.in//xmlui/handle/123456789/3695
Title: Maximizing the generation profit of runoff river hydro power plant considering the operations limitation i.e. water inflow forecasting and load forecasting while hedging against CERC regulation
Authors: Sobti, Sameer
Keywords: Dissertation
Business Administration
Power Management
Hydro Power Plant
Water Inflow Forecasting
Water Load Forecasting
Deviation Settlement Mechanism
Issue Date: Oct-2019
Publisher: College of Management and Economics Studies, UPES, Dehradun
Citation: Under the guidance of Mr. Pankaj Kapoor, Associate Vice President (O&M), AD Hydro Power Ltd.
Description: Submitted in partial fulfillment of the requirement for the degree of MBA (Power Management)
URI: http://hdl.handle.net/123456789/3695
Appears in Collections:Post Graduate

Files in This Item:
File Description SizeFormat 
500065977.pdf5.67 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.