Please use this identifier to cite or link to this item:
https://dr.ddn.upes.ac.in//xmlui/handle/123456789/2219
Title: | Execution of Naphtha and High Speed Diesel Pipeline project from Kochi Refinery to BPCL Installation Irumpanam |
Authors: | Sibi, Kevin |
Keywords: | Pipeline Engineering |
Issue Date: | 2015 |
Publisher: | M.Tech-Pipeline Engineering, Department of Mechanical engineering, College of Engineering Studies |
Citation: | Submitted Under the Guidance of: Mr. Kamal Bansal |
URI: | http://hdl.handle.net/123456789/2219 |
Appears in Collections: | Post Graduate |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
KEVIN SIBI.pdf | 1.72 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.