Please use this identifier to cite or link to this item:
https://dr.ddn.upes.ac.in//xmlui/handle/123456789/2219| Title: | Execution of Naphtha and High Speed Diesel Pipeline project from Kochi Refinery to BPCL Installation Irumpanam |
| Authors: | Sibi, Kevin |
| Keywords: | Pipeline Engineering |
| Issue Date: | 2015 |
| Publisher: | M.Tech-Pipeline Engineering, Department of Mechanical engineering, College of Engineering Studies |
| Citation: | Submitted Under the Guidance of: Mr. Kamal Bansal |
| URI: | http://hdl.handle.net/123456789/2219 |
| Appears in Collections: | Post Graduate |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| KEVIN SIBI.pdf | 1.72 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.